Chiffon cake is made by mixing the egg yolk and egg white separately.
Item No :
ZLDFJA-500Order(MOQ) :
1 setPayment :
T/T; L/CProduct Origin :
ChinaShipping Port :
Any port of ChinaLead Time :
45daysWeight :
1500KG• Machine introduction
This machine is suitable for Chiffon cake production which needs to mix the egg white and egg yolk separately.
Chiffon cake batter aeration system consists of 2 mixing tanks + 2 storage tanks + 1 aeration head + 1 Chiller + CIP cleaning system + Conveying pipelines . This machine will finish the processing of raw materials mixing, storage and aeration automatically, then transporting the cake batter into the cake depositor.
• Process flow
Egg white mixing tank (egg, sugar, flour, ingredients) → Rotor pump →Buffering tank → Screw pump of egg white →Aeration head ;
Egg yolk mixing tank (egg, sugar, flour, ingredients) → Rotor pump →Buffering tank → Screw pump of egg yolk ;
Static mixer -Cake depositor - Tunnel oven
• Targeted products
Machine name | Output product | Capacity |
ZLDF-JQ500 cake batter mixer |
Chiffon cake Sponge cake |
300-600kg/hr ; 200-700kg/hr ; |
• The number of operators
Egg white mixing : 1 person ; Egg yolk mixing : 1 person
Totally : ≤ 2 people
• Technical parameters
No. | Product | Specfic gravity of egg white | Specific gravity of mixture | Egg white mass mixing ratio |
1
|
Chiffon cake | 0.17g/ml | 0.28g/ml | ≤2.5g/ml |
• Production area
Workshop environmental requirements :
Temperature: 18-22℃
Related humidification : 50%-60%
• Equipment specifications
Power | Machine weight | Mixing tank | Storage tank | Hot&cold water machine |
32.2KW | 3700KG | 250L | 300L | 5P refrigeration, 12KW heating |
• What is the competitiveness of equipment compared to peers?
1. All parts of the aeration head are processed using the Japanese Mazak CNC machining center and the Japanese Satik slow wire processing. The finish and dimensional accuracy of the parts are very high;
2. The spindle material inside theaeration head is made of aviation stainless steel material. The strength is high and the runout is small, which greatly improves the noise and jitter of the head in the actual production process and extends the service life of the mechanical seal inside the head to a great extent;
3. The whole machine assembly of the head is assembled in the dust-free constant temperature workshop. The hot and cold loading process is adopted in the assembly process, which greatly improves the stability of the head;
4. The equipment protection device is complete: such as the screw pump with liquid level detection protection device; once the screw pump is out of material, the detection switch will immediately close the system after detection, which will not lead to dry grinding damage to the screw pump; and if the pressurized rubber sleeve is broken, the slurry in the pipeline will be directly discharged outside the equipment, and will not flow back to the electrical box to cause damage to the electrical parts;
Our hours
Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)